Extrusion Facility

📍300 Zenway Blvd.

A rooftop solar PV system with a capacity of approximately 1.17 MW DC / 1 MW AC has been designed and implemented at this facility to maximize on-site energy generation, reduce electricity costs, and lower the operation’s carbon footprint.

Project
Summary

/Estimated Annual Energy Generation (kWh) 

1,436,283

/ Simple Payback

3.60

/ Estimated Annual Savings

$ 250,832