Manufacturing Facility

📍201 Zenway Blvd.

A rooftop solar PV system with a capacity of approximately 1.17 MW DC / 1 MW AC has been designed and implemented at this industrial facility to generate on-site power, reduce energy costs, and lower the company’s carbon footprint.

Project
Summary

/Estimated Annual Energy Generation (kWh) 

1,348,131

/ Simple Payback

3.67

/ Estimated Annual Savings

$ 274,244

Image_20251113_101644_393
Image_20251121_131456_920.webp
Image_20251015_144315_496.webp
Image_20251113_101644_393.webp