Fletcher’s Meadow Secondary School
Fletcher’s Meadow Secondary School 0750 Chinguacousy Rd, Brampton In collaboration with the Peel District School Board, Circuit Energy has implemented a 418 kW s...
Fletcher’s Meadow Secondary School 0750 Chinguacousy Rd, Brampton In collaboration with the Peel District School Board, Circuit Energy has implemented a 418 kW s...
Rutherford GO Station 699 Westburne Drive, Rutherford Metrolinx has integrated solar energy into the Rutherford GO Station as part of its sustainability efforts...
Ajax H&M 106-1 Rossland Rd E, Ajax As part of its green energy initiatives, H&M’s location in Ajax now features a 192 kW s...
Plastic fabrication facility ?600 Zenway Blvd. A rooftop solar PV installation with a capacity of 880 kW DC / 750 kW AC has...
Manufacturing Facility ?201 Zenway Blvd. A rooftop solar PV system with a capacity of approximately 1.17 MW DC / 1 MW AC has...
Centennial College Scarborough Carport 941 Progress Ave, Scarborough Centennial College has enhanced its sustainability efforts by installing a 51.5 kW solar carport system...
Extrusion Facility ?300 Zenway Blvd. A rooftop solar PV system with a capacity of approximately 1.17 MW DC / 1 MW AC has...
Guelph Longo’s 24 Clair Rd W, Guelph At 24 Clair Rd W, Guelph, Circuit Energy designed and installed a 234 kW rooftop solar system for Longo’s. This...
Toronto Hydro 715 Milner Avenue, Toronto Toronto Hydro’s solar project is one of the largest on this list, with a total capacity of 6...