Extrusion Facility

This project included the deployment of a 5 MW energy system engineered to deliver 60-minute autonomy, ensuring uninterrupted support for critical facility loads. Circuit Energy managed the full scope of engineering, procurement, installation, and commissioning. The solution significantly improved power quality, reducing THDi from 9% to below 3%, while enhancing system stability, operational efficiency, and  resilience. 

Project
Summary

Capacity

5 MW

Backup Duration

60-Minute Autonomy

Harmonic Performance

Reduced to <3% THDi