Solar Projects

Guelph Longo’s

Project Address: 24 Clair Rd W, Guelph
Capacity:
234kW
Annual Energy Production: 262,782kWh
Customer:
Longo's

Ajax H&M

Project Address:106-1 Rossland Rd E, Ajax
Capacity: 192kW
Annual Energy Production: 239,040kWh
Customer: Blackwood Partners

Toronto Hydro

Project Address: 715 Milner Avenue
Capacity: 600kW
Annual Energy Production: 706,800kWh
Customer: City of Toronto/Toronto Hydro

Rutherford GO Station

Project Address: 699 Westburne Drive
Capacity: 216kW
Annual Energy Production: 261,576kWh
Customer: Metrolinx

Fletcher’s Meadow Secondary School

Project Address: 10750 Chinguacousy Rd
Capacity:
418kW
Annual Energy Production: 476,520kWh
Customer:
Peel District School Board

Centennial College Scarborough Carport

Address: 941 Progress Ave, Scarborough
Capacity:
51.5 kW
Annual Energy Production: 60,306kWh
Customer:
Centennial College

Project Milestons

Engineering

► Conduct 3D Energy Simulation and Modeling
► Prepare Comprehensive Interconnection Engineering Documentation
► Create Issued for Permit/Review (IFP/IFR) Design Documentation
► Produce Construction-Ready, Issued for Construction (IFC) Drawings Package
► Generate full BOM (Bill of Materials) inc. Major Equipment and BOS (Balance of System)
► Compile and Deliver As-Built Documentation Package
► Review, Validate and Confirm Commissioning Sheets Reports
► Generate Punchlist for Troubleshooting, Debugging or Any Required Fixes

Procurement and Project Management

► Develop Detailed Procurement and Project Management Plan
► Finalize Purchase Orders Equipment
► Conduct FAT/SAT (Factory/Site Acceptance Testing) if Required
► Conduct Risk Assessment and Mitigation Planning
► Monitor Project Progress Against Schedule and Budget
► Ensure Compliance with Health, Safety, and Environmental Standards
► Manage Project Documentation and Reporting to Client
► Prepare for Project Closeout and Final Handover

Construction

► Hold Construction Kick-Off Meeting and Perform Site Walk
► Prepare the Site for Construction Activities
► Manage Equipment Delivery Process
► Mechanical Installation of All Components
► Electrical Installation of All Components (No Energization Yet)
► Execute Pre-Energization Commissioning
► Facilitate Final Inspection by AHJ (Authority Having Jurisdiction)
► Address and Correct Inspection Punch List Items from Engineering (if any)

Key Benefits

Cost Savings

► Reduced Energy Bills
► Protection Against Rising Energy Prices
► Utilizing Tax Incentives and Rebates

Environmental Impact

► Reduced Carbon Footprint
► Compliance with Environmental Regulations

Enhanced Corporate Image

► Market Differentiation, Can Attract environmentally conscious customers
► Public Relations and Branding, Enhancing the Company’s Image As A Forward- Thinking, Sustainable Business

Long-Term Investment

► Increased Property Value
► Attractive ROI

Call us today to discuss the potential savings awaiting you.